Batches of 50 to 10,000 pieces machined to a stable, audited drawing. JIT delivery on monthly or quarterly call-offs. EN 10204 mill certs and lot traceability on every dispatch. Contract pricing that drops sharply past 500 pieces.
Once a drawing is right, the work changes. Production isn't about flexibility — it's about repeatability, schedule reliability and consistent paperwork across thousands of pieces. We run that side of the shop on its own rhythm: dedicated programs, dedicated fixtures, dedicated material lots.
A production contract at Enex looks like this: one approved drawing, an agreed annual or 6-month forecast, monthly or quarterly call-offs, and weekly dispatch against the call-off. Material is sourced against the forecast — so a call-off becomes a 5-10 day machining cycle, not a 6-week material-procurement cycle.
EN 10204 type 3.1 mill certs on every dispatch. Lot traceability with material heat numbers from the bar to the finished pallet. Sampled dimensional inspection on critical features (5% of batch standard, 100% as an add-on). The paperwork that lets your QMS sign off without a follow-up email.
Indicative price-per-piece bands for a representative bronze bushing in C932, 50mm OD × 35mm ID × 60mm long. Your part will quote to its own curve; this shows the shape.
// Indicative only. Real quote depends on material grade, tolerance, finish, secondary ops, freight terms and contract length. We provide a per-piece curve at the quantity bands you ask for.
Standard QA package on production runs — at no upcharge. Add-ons (100% inspection, sour-service material verification, NDT) quoted separately at order stage.
ge.Material certificate from the mill, with chemical analysis and mechanical properties, on every dispatched batch.
Each batch numbered and traceable from raw bar to finished pallet. Heat numbers cross-referenced to part serials where stamped.
Sampled inspection of critical features at 5% of batch (3-piece minimum). Full 100% inspection available as a per-piece add-on.
Standard structure for a rolling production contract. Custom terms negotiated at PO stage where the situation warrants.
| Element | Standard | Notes |
|---|---|---|
| Drawing approval | Single approved revision | ECN process for changes — dimensional cuts re-quoted, drawing-only changes free |
| Forecast horizon | 6-12 months rolling | Monthly forecast updates from customer, no commitment past next call-off |
| Call-off cadence | Monthly or quarterly | Weekly possible on high-cadence contracts; smaller batches per dispatch |
| Material sourcing | Against forecast | 5-10 day machining lead time on common grades; 5 wd extra for specialist grades |
| Dispatch | Weekly, palletised | Standard freight terms; nominated freight provider on request |
| QA package | 3.1 mill cert + lot trace + sampled dim | 100% inspection / NDT as add-ons |
| Pricing | Per-piece, fixed for contract term | Annual review on multi-year contracts, indexed to material market |
| Storage | 60 days forward finished-goods free | Beyond that, indicative storage charge agreed at PO stage |
| NCR / rework | Replace at no charge within 30 days | Documented NCR process; root-cause report on systemic issues |
Cross-drilled brass bushings turned from solid bar. Bored, faced both ends and grease-port drilled in a single setup. Multiple sizes, repeat orders from trailer and equipment fleet customers.
Run against a rolling forecast — material sourced ahead of the call-off so each order becomes a machining cycle, not a procurement cycle. Sampled dim inspection per batch, EN 10204 3.1 mill cert per heat number on request.
// Brass bushings · cross-drilled · sampled dim report
Batches from 50 to 10,000 pieces. Smaller volumes are quoted as low-volume or prototype work; larger than 10,000 are typically split across scheduled deliveries to keep customer storage costs down.
Yes. Standard contract structure is a single approved drawing, monthly or quarterly call-offs, and weekly dispatch of the agreed quantity. Storage at the Malaga workshop is included for up to 60 days of finished-goods inventory.
Pricing is quoted at a per-piece price for the contracted quantity. Setup amortises sharply past 200-500 pieces depending on the part complexity. We provide a per-piece curve at quote stage so you can see the breakeven across 100, 500, 1000, 2000+ piece bands.
EN 10204 type 3.1 mill test certificates, lot traceability with material heat numbers, and a dimensional inspection report on a sampled basis (typically 5% of batch on critical features). Full 100% inspection available as an add-on.
Yes. Most regular customers operate on a rolling 6-month forecast with monthly call-offs. Material is sourced against the forecast and the part is machined against the call-off — typical lead time is 5-10 working days.
Several customers are on multi-year rolling contracts — bushings for a mineral-processing OEM since 2021, hanger pins for a fleet contractor since 2022. Schedule reliability and consistent dimensional output across thousands of pieces is the moat.
The front half of a production contract — sketch to working part to first article in 5-15 days.